Monitoring cold cracking indications in main girders
Monitored: Cold cracking indications at the main girder to flange connections
Problem
An annual inspection that shuts a lane for two weeks
Cold cracking runs along the connections between the main girders and the flanges, introduced during fabrication rather than by fatigue in service
To keep the bridge safe, every indication has to be inspected each year from an under bridge inspection unit, a truck mounted platform that reaches over the parapet and works beneath the deck
That inspection costs €150,000 a year and takes a lane out for two weeks, every year, for as long as the bridge stands