Ports & Terminals
Preventive monitoring of STS backstay connections
Monitored: Backstay to A frame connection points, lug and gusset welds, pin connections
Problem
Fracture critical, and only reachable from a rope
The backstay to a frame connections carry boom and trolley load on every container move, and fatigue initiates at the lug and gusset weld toes
They sit at the top of the A frame, so reaching them means rope access or a man basket, in a weather window, with the crane out of service
Between structural surveys nobody sees them at all, and a coated weld hides a crack until it is long enough to find by eye
These connections are fracture critical. A failure here is not a repair, it is a catastrophic failure and a berth out of service